We implemented the construction of the Farawayne Haffir Dam to improve rainwater harvesting and water access for rural and pastoralist communities in one of Somaliland’s drought-affected regions. The implementation was carried out in strict accordance with the pre-approved designs, technical drawings, and specifications provided by the responsible authorities.
We began with comprehensive site preparation, including geotechnical mapping, land grading, and the establishment of cut-and-fill zones. Our team executed the excavation of the reservoir basin and construction of embankments, ensuring proper shaping and compaction. These operations were guided by GPS and RTK surveying equipment to maintain alignment with design parameters and ensure long-term structural integrity.
We constructed a spillway system to safely divert overflow and reduce the risk of structural erosion. The embankments were stabilized through a combination of compacted earth shoulders, vegetative cover, and targeted erosion control measures tailored to the silty local subsoil conditions.
In addition to the main dam structure, we implemented the following auxiliary systems to enhance operational efficiency, safety, and community benefit:
The implementation was carried out by a dedicated team consisting of two civil and Water engineers and eighteen (18) general and skilled workers, including local labor. We deployed and rotated essential heavy machinery, excavators, bulldozers, compactors, water tankers, and service vehicles to align with each phase of work, ensuring efficiency and adherence to schedule.
All construction activities were executed to meet the required engineering, environmental, and safety standards, resulting in a fully functional haffir dam now supporting water resilience and community well-being in Farawayne.





















The Farawayne Haffir Dam was completed on schedule and successfully commissioned for community use by the end of the rainy season. Designed with an effective catchment area and built on a solid structural foundation, the dam now serves as a vital resource for drought mitigation, providing reliable water storage that supports livestock hydration and agricultural activities throughout dry periods.
This project highlights our ability to deliver tailored and resilient dam infrastructure by leveraging efficient team coordination, modern construction technologies, and adaptable methods. Despite the challenges posed by the variable terrain and local soil conditions, we ensured the dam’s long-term stability and functionality, ultimately enhancing water security and improving livelihoods for the surrounding communities.